CPIM certification: what ASCM's planning credential covers

Certified in Planning and Inventory Management · Association for Supply Chain Management (ASCM)

Every figure below names its document; this page draws on 11 documents, last checked Nov 18, 2026.

CPIM certification stands for Certified in Planning and Inventory Management, a credential from ASCM (formerly APICS) that ASCM itself writes as APICS CPIM. It is built for the people who run planning inside one company: turning a business plan into a sales and operations plan, a master schedule, material and capacity plans, inventory targets and the daily schedule on the floor. The whole credential rests on a single sitting of 150 questions and 3.5 hours of testing, and nothing has to be documented before you buy it. The content follows ECM 9.0, the edition in force since June 1, 2026. 1 4 5 8

Parts of this page 12 parts
  1. The credential in brief, each line with its document
  2. Who holds it: planners inside one operation
  3. Requirements: no application before you buy
  4. Nine content areas, weighted by ASCM
  5. Version 9.0 replaced 8.0 on June 1, 2026
  6. Maintenance: points, a fee and a five-year clock
  7. Credentials that share letters or territory
  8. A short warm-up before the full practice set 5
  9. Next steps: practice set, study guide, scoring, fees
  10. Other supply chain credentials on Testkord
  11. Name, entry rules, membership and renewal 4
  12. The documents behind this page

The credential in brief, each line with its document

Fact As the documents put it Source
Certifying organization ASCM, the Association for Supply Chain Management (formerly APICS), based in Chicago. The credential still carries the older brand: ASCM writes it as APICS CPIM. CPIM ECM 9.01 ASCM handbook 20262
Designation CPIM, Certified in Planning and Inventory Management. Active holders who teach, present, publish or volunteer for ASCM can apply for the Fellow level, CPIM-F. CPIM ECM 9.01 ASCM handbook 20262
Former program name Certified in Production and Inventory Management until February 25, 2021, when ASCM renamed the program. The new title was applied to existing holders as well, with no change to their certification dates or maintenance timeline. ASCM handbook 20233
From two exams to one A single exam since version 8.0 opened on June 1, 2023; version 7.0 had two, Part 1 and Part 2. February 1, 2024 was the final day to sit either 7.0 part. ASCM handbook 20233 CPIM ECM 9.01
Built for People in planning, production and inventory management, materials management, purchasing and procurement inside their own organization. ASCM chart 20264 CPIM ECM 9.01
Prerequisites No eligibility application: buying the exam issues the authorization to test, with no degree or work history to document. ASCM handbook 20262 ASCM handbook 20233
Content manual followed here Exam Content Manual version 9.0, in force since June 1, 2026. CPIM ECM 9.01 CPIM 9.0 FAQ5
Maintenance cycle Five years, starting on your certification date. CPIM ECM 9.01 ASCM maintenance page6

From ASCM's CPIM Exam Content Manual 9.0, the exam handbook (October 2026 edition, plus the January 2023 edition for the name change), the comparison chart of February 2026 and the maintenance page as archived October 24, 2026; checked November 18, 2026. The exam itself in detail: format and scoring. Prices and booking: registration.

Who holds it: planners inside one operation

ASCM's comparison chart lists the credential for people in planning, production and inventory management, materials management, purchasing and procurement inside their own organization. Day to day, those areas mean work such as owning the master schedule, acting on MRP exception messages, setting inventory targets and running the monthly S&OP cycle. The common thread is the plant or the company's own network of sites: how much to make, when, with which capacity, and how much stock to carry while doing it.

Older job ads still read the P as Production, the name ASCM retired in 2021; the table above gives the date. Course listings that still sell two separate parts predate the single exam that arrived with version 8.0.

Work that reaches past the company's own walls, into network design, global logistics and customer and supplier partnerships, sits closer to ASCM CSCP, ASCM's other broad credential. For the two side by side, see CPIM or CSCP on the supply chain certification page.

Documents behind this part: ASCM chart 20264 CPIM ECM 9.01

Requirements: no application before you buy

ASCM runs no eligibility review: nothing is submitted or approved before the purchase. Neither ASCM membership nor a planning job title is needed either; membership with the Certification Upgrade only lowers the price. Arrangements for a disability are requested from Pearson VUE before booking, as the registration page explains.

The route from decision to credential is short:

1 Buy the exam on ascm.org. The purchase is your authorization to test, and it has an end date.
2 Reserve a date with Pearson VUE before that window closes, choosing a center seat or an OnVUE session.
3 Score 300 or more on the 200–350 scaled range; should a first attempt fall short, the exam facts page gives the waiting period for a second.
4 Log professional development points to hold on to the credential, as the maintenance section explains.

Documents behind this part: CPIM ECM 9.01 ASCM scoring page8 CPIM program page9

Nine content areas, weighted by ASCM

Version 9.0 divides the exam into nine areas, and ASCM weights each by percentage, never by number of items. Plan and Manage Inventory is the largest at 14%. Four areas sit at 12%: strategy, demand, internal supply and detailed schedules. Plan and Manage Distribution is the smallest at 8%.

The two supply areas are new as a pair. Plan and Manage Internal Supply Sources (12%) holds master scheduling, rough-cut capacity and MRP; Plan and Manage External Supply Sources (11%) holds supplier selection, supplier relationships and purchasing. Clicking a bar takes you to that area's section in the CPIM study guide.

Share of the exam per content area in version 9.0, with the version 8.0 share beside it, from ASCM's two content manuals.

Area
ECM 9.0 covered here
12%
10%
12%
12%
11%
14%
12%
8%
9%
ECM 8.0 2023–2026
15%
9%
9%
16% IV and V were one area
19%
16%
5%
11%
Shift in pp
−3 pp
+1 pp
+3 pp
Split: IV 12% + V 11% (23% together)
−5 pp
−4 pp
+3 pp
−2 pp
Old edition, to scale ECM 8.0

ECM 9.0 against ECM 8.0, percent by area

  1. I Strategy 15% → 12% (−3 pp)
  2. II S&OP 9% → 10% (+1 pp)
  3. III Demand 9% → 12% (+3 pp)
  4. IV Internal supply 12% ECM 8.0: merged with V, 16%
  5. V External supply 11% ECM 8.0: merged with IV, 16%
  6. VI Inventory 19% → 14% (−5 pp)
  7. VII Detailed schedules 16% → 12% (−4 pp)
  8. VIII Distribution 5% → 8% (+3 pp)
  9. IX Quality, CI & technology 11% → 9% (−2 pp)

IV–V in ECM 8.0: 16%, as the single supply area of 8.0. pp = percentage points.

CPIM ECM 9.01 CPIM 9.0 FAQ5 CPIM ECM 8.07
Area by area: what each one covers
Content area ECM 9.0 ECM 8.0 Topics the manual lists
I. Align the Supply Chain to Support the Business Strategy 12% 15% Business environment and corporate strategy, functional and operational strategies, process design, key performance indicators, supply chain risks, and sustainability goals.
II. Conduct Sales and Operations Planning (S&OP) to Support Strategy 10% 9% The role of the S&OP process, the aggregate demand plan, the aggregate supply plan, and reconciling portfolio, demand, supply and financial plans.
III. Plan and Manage Demand 12% 9% Customer needs and specifications, marketing and product management, sources of demand, the forecasting process, and forecast performance and demand variation.
IV. Plan and Manage Internal Supply Sources 12% 16% (all supply) Master scheduling, the rough-cut capacity plan, the material requirements plan, final assembly scheduling, product costs, and changes and supply disruptions.
V. Plan and Manage External Supply Sources 11% — Supplier selection, supplier relationship management (SRM), purchasing goods and services, and supplier changes and disruptions.
VI. Plan and Manage Inventory 14% 19% Inventory planning, inventory management, inventory costs, inventory control, and returns and product disposition.
VII. Plan, Manage, and Execute Detailed Schedules 12% 16% Planning detailed schedules, creating production and labor schedules, and implementing and managing those schedules.
VIII. Plan and Manage Distribution 8% 5% Planning distribution and managing customer orders.
IX. Manage Quality, Continuous Improvement, and Technology 9% 11% Managing quality, continuous improvement, and technology.

Documents behind this part: CPIM ECM 9.01 CPIM 9.0 FAQ5 CPIM ECM 8.07

Version 9.0 replaced 8.0 on June 1, 2026

The biggest structural change is supply: 8.0 kept it in a single area, and 9.0 gives internal and external sources an area each. The chart above shows every share before and after.

Material written for version 8.0 follows its eight areas (older material, the two parts of 7.0), so compare any table of contents with the nine areas above before relying on it. The study guide sets the two editions side by side, area against area.

Fact As the documents put it Source
Version change Version 9.0 replaced 8.0 on June 1, 2026, the day after the last 8.0 sittings; the two never ran side by side. ASCM published the 9.0 manual on November 4, 2025 and began selling 9.0 study materials on February 3, 2026. CPIM 9.0 FAQ5 CPIM ECM 9.01
Previous content manual ECM 8.0, used from June 1, 2023 through May 31, 2026, in eight areas: strategy 15%, S&OP 9%, demand 9%, supply 16%, inventory 19%, detailed schedules 16%, distribution 5%, and quality, continuous improvement and technology 11%. Version 9.0 split the one supply area into internal and external supply sources, 23% together against 16%. Inventory fell from 19% to 14% and detailed schedules from 16% to 12%; demand rose from 9% to 12% and distribution from 5% to 8%. CPIM ECM 8.07 CPIM ECM 9.01
Job task analysis A 2024 job task analysis built on survey answers from more than 1,800 professionals. CPIM ECM 9.01

From ASCM's CPIM Exam Content Manuals 8.0 and 9.0 and its FAQs on the move to version 9.0, read November 18, 2026.

Maintenance: points, a fee and a five-year clock

A cycle lasts five years from your certification date. Over it you collect professional development points and pay a maintenance fee, lower for ASCM members; the amounts are in the table below. Membership earns points every year on its own, ASCM's CHAINge conference adds more, and one set of points serves every APICS certification you hold.

A missed deadline suspends the credential rather than ending it, and a short filing window follows; once that closes, only a new exam pass brings it back. Older holders with a current certification can apply for free lifetime status, under the age rule in the table.

Fact As the documents put it Source
Points to maintain 75 professional development points every five years, or 100 for CPIM Fellows. Membership earns 6 points a year (30 per cycle), and ASCM’s CHAINge conference up to 18. The same points count for every APICS certification you hold. ASCM maintenance page6 CPIM ECM 9.01 ASCM chart 20264
Maintenance fee $100 for ASCM members, $200 for nonmembers, paid with the maintenance application. ASCM chart 20264 ASCM maintenance page6
Missed maintenance Suspension at the due date, then 90 days to file; after that the certification expires and the exam must be passed again. ASCM maintenance page6 CPIM ECM 9.01
Lifetime status Free lifetime status for holders aged 62 or older with a current certification, on written request with proof of age. ASCM handbook 20262

From ASCM's certification maintenance page (archived October 24, 2026), the comparison chart of February 2026 and the exam handbook of October 2026.

Credentials that share letters or territory

Mix-ups worth ruling out:

  • Incentive CPIM: the Certified Professional of Incentive Management belongs to the incentive and rewards industry, unrelated to ASCM or to planning.
  • ASCM's other APICS certifications sit next to it: ASCM CSCP, which spans the whole supply chain, CLTD, which covers logistics, transportation and distribution, and CTSC, on supply chain transformation.
  • ISM’s CPSM, Certified Professional in Supply Management, a separate procurement credential earned by passing three exams; it comes from a different body, the Institute for Supply Management.

Documents behind this part: My Next Move page10 ASCM chart 20264 CPSM page11

A short warm-up before the full practice set

Tally: 0/5 tried, 0 on the key
I Strategy · 12% Question 1 of 5

A tire manufacturer buys a rubber plantation that supplies its own plants. This move is an example of:

Choose a letter to record your answer; each option then opens with its reasoning.

  1. horizontal integration of rivals. Check A
    Off the key. Horizontal integration means acquiring a company at the same stage, such as another tire maker; a plantation is a supplier, not a rival.
  2. backward vertical integration. Check B
    This is the keyed answer. Buying the plantation that grows its rubber moves the tire maker upstream into its own input supply, which is backward vertical integration.
  3. strategic outsourcing. Check C
    Off the key. Outsourcing hands an activity to an outside firm; owning the plantation does the opposite and brings rubber supply in-house.
  4. forward vertical integration. Check D
    Off the key. Forward integration runs toward the customer, such as a tire maker buying a chain of tire dealers; a rubber plantation sits on the input side.
You chose—
Key—
Outcome—

Study notes for this area: Strategy

III Demand · 12% Question 2 of 5 Bottom-up

Bottom-up (grassroots) forecasting is most appropriate when:

  1. item-level history is short and noisy. Check A
    Off the key. Short, noisy item data argues for forecasting the aggregate, where errors offset, and then splitting the total down, which is top-down.
  2. only aggregate totals are needed for planning. Check B
    Off the key. If planning needs only totals, forecasting the aggregate directly is simpler and usually more accurate than summing many item forecasts.
  3. segments have distinct demand drivers. Check C
    This is the keyed answer. When each segment responds to its own drivers, forecasting segment by segment captures those differences before the totals are summed, which is the strength of a bottom-up build.
  4. the family's product mix is stable and uniform. Check D
    Off the key. A stable, uniform mix lets a family total be split by fixed percentages, the classic case for top-down forecasting.
You chose—
Key—
Outcome—

Study notes for this area: Demand

VI Inventory · 14% Question 3 of 5

Which item is best suited to an order point system rather than MRP?

  1. A component whose usage follows the MPS Check A
    Off the key. Usage tied to the MPS is dependent demand; MRP calculates it from the schedule instead of waiting for stock to fall to a trigger level.
  2. A subassembly used in weekly lots of its parent Check B
    Off the key. A subassembly is needed when its parent is built, so MRP derives its timing from the parent's weekly lots rather than from an average usage rate.
  3. A raw material consumed in large production runs Check C
    Off the key. Large draws for production runs are dependent and lumpy, so an order point would sit idle and then be overrun; MRP times these needs from the schedule.
  4. A service part with steady independent demand Check D
    This is the keyed answer. A service part is ordered by outside customers, so its demand is independent and fairly steady, which is what an order point system assumes.
You chose—
Key—
Outcome—

Study notes for this area: Inventory

VII Detailed schedules · 12% Question 4 of 5

Used on its own, which priority rule is most likely to leave long jobs waiting in queue indefinitely?

  1. Shortest processing time Check A
    This is the keyed answer. Shortest processing time always moves the quickest jobs to the front, so a long job keeps getting passed over as new short jobs arrive.
  2. Critical ratio Check B
    Off the key. Critical ratio compares time remaining with work remaining, so a long job's ratio falls as it waits and the rule pulls it forward.
  3. Earliest due date Check C
    Off the key. Earliest due date ranks jobs by due date regardless of length, so a long job rises to the top as its date approaches.
  4. First-come, first-served Check D
    Off the key. First-come, first-served works in arrival order, so every job eventually reaches the front; the rule is slow on urgent work, but it never starves a job.
You chose—
Key—
Outcome—

Study notes for this area: Detailed schedules

II S&OP · 10% Question 5 of 5

Under which condition is a chase strategy generally preferred to a level strategy for a family?

  1. The product is perishable and hard to store Check A
    This is the keyed answer. A perishable product that is hard to store suits a chase strategy, which matches output to demand each period and holds little stock.
  2. Equipment is costly and needs a steady load Check B
    Off the key. Costly equipment that needs steady use points to a level strategy, where inventory absorbs the demand swings.
  3. Hiring and training costs are very high Check C
    Off the key. Chasing demand means frequent hiring and layoffs, so high hiring and training costs favor a level workforce.
  4. Workers are highly skilled and hard to hire Check D
    Off the key. Skilled, scarce workers are hard to replace after a layoff, which argues for keeping the workforce level.
You chose—
Key—
Outcome—

Study notes for this area: S&OP

Next steps: practice set, study guide, scoring, fees

Other supply chain credentials on Testkord

Name, entry rules, membership and renewal

What does CPIM stand for today, and what did it stand for before?

Certified in Planning and Inventory Management. Until February 2021 the P stood for Production; ASCM changed the title for existing holders too, without touching their certification dates.

Do you need planning experience or a degree to earn the CPIM?

No. ASCM asks for no proof of education or work history; buying the exam issues the authorization to test.

Is ASCM membership required to take the CPIM exam?

No. Membership with the Certification Upgrade gives the lower price on the exam, the Learning System and the bundle; membership alone lowers the maintenance fee later. Every price, with its date, is on the registration page.

Does an existing CPIM holder have to test again on version 9.0?

No. A new content manual changes the exam for new candidates. Holders keep the credential by collecting maintenance points each cycle; a retest is needed only if the certification is allowed to expire.